BASAR CONSTRUCTION STAGE

BASAR PROGRAM OF WORKS

 

I. WATER SYSTEM

   A. Concrete Deep well......(already completed)

   B. Elevated Concrete Water Tank

   C. Water Conveyance Fittings

   D. Electric Motor w/ Water Pump (diam. 1.5")

 

II. SHELTERS

   A. Office and Animal Clinic and Staff Quarters

   B. Canine Quarters

   C. Feline Quarters

   D. Farm Animal Quarters (fowls, goats, swine, cattle)

   E. Chainsaw(to size trees for lumber)

 

III. ELECTRIFICATION

   A. Service Meter Installation

   B. Distribution Lines

   C. Lighting ang Heating Equipments

 

IV. FENCES

   A. Quarters' Division Fence

   B. Perimeter Fence

 

 

CONSTRUCTION OF WATER SYSTEM

A.  CONCRETE DEEP WELL

SAVE US!!!

 

DOG SWIMMING POOL

-------o0o-------

     -------0O0-------

This is the dog swimñing pool. Although this is not included in our program of works, but we found it important to have its construction first because Philippines is currently hi t by the El Niño Phenomenon and our dogs are feeling the severe hotness during the middle of the day...

This is the first part of BASAR's Water System, the Concrete Deep Well. The white Asterisk on the upper left picture represents the location of the Deep Well. On the next picture above center is the our old shallow Well being replaced by bigger and deeper Concrete Well for storing enough water for the animals. Below are pictures during the progress of the Well constructions. Now the Concrete Deep Well is ready for use manually until the Pipe Fittings with Electric Motor and Water Pump are connected to the Elevated Concrete Water Tank which are yet to be constructed...

bottom of page